Located about 17m upstream from the Main Flood Rising.
Description
A obvious entrance on the southern side of the valley in the shape of a phreatic tube formed on a bedding plane. The entrance is 1m high and 1.5m wide and leads to an earth bank after 5m. A short climb leads to a chamber 1m high x 4m across with all passages leading out choked.